• 2024 Summer is such a situation.

  • As ongoing projects, there are LabYouth, Naemura Lab, CGUI, and Fractal Summary.

    • Each project is being worked on by 1-2 people.
    • Additionally, there are projects related to basi, space robots, and Yanai.
  • First and foremost, it is a very obvious fact that “when there are n projects in progress, only 1/n of time can be allocated to each.”

    • I feel like I haven’t really recognized this fact much (blu3mo)(blu3mo).
    • It’s similar to the concept of Normalcy Bias.
    • One should feel a sense of urgency about this fact (blu3mo)(blu3mo)(blu3mo).
  • So, what can be done?

    • Increase the total working time.
    • Improve work efficiency.
    • Reduce one’s own workload.
      • Collaborate with others.
        • Utilize individuals where they are most suitable.
      • Reduce unnecessary meetings.
    • Improve communication efficiency.
      • Respond promptly.
  • I recommend building a routine (tkgshn).

  • It becomes an overhead to think “What should I do now?” (nishio).

    • If you are doing things randomly, you will inevitably end up in a situation where there are multiple tasks of almost equal priority in front of you.
    • Establishing a rule like “If you can’t determine priority in 5 seconds, do tasks in alphabetical order” might make things easier (blu3mo).